We are keen to ensure we continue to deliver information on the products and services that are of interest to you, as well as our range of case studies. If you have any suggestions of topics you would like us to cover, please contact us to let us know.
To learn what TEC talks we have scheduled, visit the TEC talks page.
CSNRI Composites provides PDH certificates for attendance at LIVE TEC talks ONLY.
![Tec-talks-OnDemand-Logo-01 TEC Talks On-Demand](https://www.cs-nri.com/wp-content/uploads/2022/02/Tec-talks-OnDemand-Logo-01.png)
CSNRI COMPOSITES
![Wrinkle_TECtalk](https://www.cs-nri.com/wp-content/uploads/Wrinkle_TECtalk.jpg)
Basics of Composite Repair Theory
Delivered on April 1 & 3, 2020
![Photo 2](https://www.cs-nri.com/wp-content/uploads/Photo-2.jpg)
Crack Repair with Composite Materials
Delivered on April 7 & 9, 2020
![IMG_2830](https://www.cs-nri.com/wp-content/uploads/IMG_2830.jpg)
Composite Repair Options for Tanks
Delivered on April 14 & 16, 2020
![Process-Piping-1](https://www.cs-nri.com/wp-content/uploads/Process-Piping-1.png)
Plant Maintenance with Composites: Cooling Water, Flare & Chemical Lines Delivered on April 21 & 23, 2020
![Shawcor_CSNRI1_web](https://www.cs-nri.com/wp-content/uploads/Shawcor_CSNRI1_web.jpg)
Training Requirements for Composite Repair Systems
Delivered on April 28 & 30, 2020
![Black Diamond Field Bend Black Diamond Field Bend](https://www.cs-nri.com/wp-content/uploads/Field-Bend-blurred.jpg)
Fatigue, Wrinkle, & Dent Repair with Composites
Delivered on May 5 & 7, 2020
![Syntho-Glass XT Apps being installed-web Syntho-Glass XT Apps being installed-web](https://www.cs-nri.com/wp-content/uploads/Syntho-Glass-XT-Apps-being-installed-web.jpg)
Composite Repair Design Life & Life Expectancy
Delivered on May 12 & 14, 2020
![Atlas 7- tec talk](https://www.cs-nri.com/wp-content/uploads/Atlas-7-tec-talk.jpg)
Addressing Axial and Bending Loads with Composites
Delivered May 19 & 21, 2020
![gouged-pipeline-3](https://www.cs-nri.com/wp-content/uploads/gouged-pipeline-3.jpg)
Pipeline Regulations and Composite Repairs
Delivered on May 26 & 28, 2020
![Scar-Guard after pull back](https://www.cs-nri.com/wp-content/uploads/Scar-Guard-after-pull-back.jpg)
Composites for HDD Coating Protection
Delivered on June 9 & 11, 2020
![](https://www.cs-nri.com/wp-content/uploads/P9120161-scaled.jpg)
The Role of Surface Preparation in Composite Repair Systems
Delivered on June 23 & 25, 2020
![WhatsApp Image 2020-02-04 at 6.46.25 PM](https://www.cs-nri.com/wp-content/uploads/WhatsApp-Image-2020-02-04-at-6.46.25-PM.jpeg)
The Influence of Temperature on Composite Repairs
Delivered July 7 & 9, 2020
![PipeWrap PipeWrap](https://www.cs-nri.com/wp-content/uploads/2019/10/Pipe-Wrap-Pic-VP-web.jpg)
Composites and Leak Repair Needs
Delivered on July 21 & 23, 2020
![Thetop10myths](https://www.cs-nri.com/wp-content/uploads/Thetop10myths.png)
Busted! The Top 10 Myths About Composite Repairs
Delivered on August 4 & 6, 2020
![tank pic](https://www.cs-nri.com/wp-content/uploads/tank-pic.jpg)
Composite Repairs for Tanks: An Update from API 653
Delivered August 18 & 20, 2020
![Acid-Shield Acid-Shield](https://www.cs-nri.com/wp-content/uploads/2019/11/Acid-Shield1-1.jpg)
Composite Repairs & Harsh Chemicals
Delivered September 1 & 3, 2020
![30 - Dunlin Deck - Stage 2 CRC and Glass](https://www.cs-nri.com/wp-content/uploads/30-Dunlin-Deck-Stage-2-CRC-and-Glass.jpg)
Deck & Structural Repair with Composites
Delivered on October 6 & 8, 2020
![ScarGuard ScarGuard](https://www.cs-nri.com/wp-content/uploads/2019/10/Oneida-Post-Pull-Tight.jpg)
We pull you through: Ensuring coating protection for HDD applications
Delivered on Nov. 10 & 12, 2020
![clock sprign install rope access](https://www.cs-nri.com/wp-content/uploads/clock-sprign-install-rope-access.jpg)
The Many Installation Techniques of Composite Repairs
Delivered January 12 & 14, 2021
![XT-CS-Offshore-6in-OD-Offshore-Pipeline-USA-CB-Rev-8-04.12.12_web_Page_1_Image_0031](https://www.cs-nri.com/wp-content/uploads/XT-CS-Offshore-6in-OD-Offshore-Pipeline-USA-CB-Rev-8-04.12.12_web_Page_1_Image_0031-e1614791682880.jpg)
Offshore Composite Repair Solutions
Delivered March 30 & April1, 2021
![New portfolio](https://www.cs-nri.com/wp-content/uploads/2021/05/CSNRI-Day-2B-584-scaled.jpg)
CSNRI Streamlined Solutions with Unmatched Performance
Delivered on June 8 & 10, 2021
![TridentSeal](https://www.cs-nri.com/wp-content/uploads/2021/07/P3210028-scaled.jpg)
Natural Gas Leak Repair with Composites
Delivered on August 24 & 26, 2021
![Mobilisation of all equipment by helicopter. Mobilisation of all equipment by helicopter.](https://www.cs-nri.com/wp-content/uploads/2019/10/helicopter-e1627059562759.png)
Top 8 Most Unique Projects with Composites
Delivered on November 9 & 11, 2021
![CSNRI Geohazard Testing CSNRI](https://www.cs-nri.com/wp-content/uploads/2022/02/Geohazard-testing-scaled-e1644872993591.jpg)
Composite Repairs for Geohazard Events
Delivered on March 29 & 31, 2022
![Clock Spring 25 years Clock Spring 25 years](https://www.cs-nri.com/wp-content/uploads/2021/05/CNRI-Burst-Test-Setup-Closeup-scaled-e1620248354613.jpg)
Long-term Composite Testing and In-field Performance with Case Studies
Delivered on May 17 & 19, 2022
![Inductosense WAND](https://www.cs-nri.com/wp-content/uploads/2022/08/TEC-talk-image-01-e1663327009837.jpg)
Smart Composite Repairs with Embedded Wall Thickness Monitoring
Delivered on Sept. 14, 2022
![TridentSeal](https://www.cs-nri.com/wp-content/uploads/2021/07/P3210028-scaled.jpg)
TridentSeal Puts Live Leaks and Fugitive Emissions Under Wraps
Delivered on April 25, 2023